+65 6748 3133

Fullerton Bay Hotel

80 Collyer Way, Singapore 04926

supply & installation

Rope Access Building Facade Works

Rope Access Building Facade Works

Citiwall was entrusted with the facade rectification works for Fullerton Bay Hotel, which involved a thorough process of dismantling the existing structures, followed by the supply and installation of high-quality glass balustrades.

Our team of professionals carefully assessed the condition of the facade, identifying areas that required repairs and ensuring the rectification process adhered to strict safety standards and industry regulations. The dismantling was conducted with precision to minimize disruptions, and the new glass balustrades were designed to enhance both the aesthetic appeal and safety of the building.

These modern, sleek balustrades provide a contemporary touch while ensuring durability and structural integrity. Citiwall’s dedication to quality craftsmanship and attention to detail played a pivotal role in successfully completing the facade rectification works, resulting in an upgraded and visually striking building facade.

  • Building facade rectification works including dismantling, Supply & Installation of glass balustrade.
  • Rope Access Installation

Message Us

Get in touch with us

Call Us

+65 6748 3133

Office Location

24 Kaki Bukit Crescent Singapore 416255

Office Hours

Monday – Friday: 9am – 6pm

Email

admin@citiwall.com.sg